Add to Gallery: | Add this photo to a Gallery |
Category: | General road environment: Other (infrastructure-related) |
Tags: | a726, barrier, crossing, dualcarriageway, keepclear, pedestrian, split, staggered |
Date time: | 12.23pm, Friday 29th November, 2019 |
Time line: | Earlier | Later |
Facing: | North west |
Added by: | andypreece |
Copyright: | CC Attribution-Share Alike (by-sa) |
Download: | View full-size original |
Area: | Renfrewshire |
A pedestrian crossing across Hurlet Road, linking Ben Nevis Road to the path to Glenapp Avenue for pedestrians.
Comments reflect the views of the original submitter only.