Add to Gallery: | Add this photo to a Gallery |
Category: | Cycleway: A problem that needs to be fixed |
Tags: | stockley, trail |
Date time: | 10.04am, Monday 31st December, 2018 |
Time line: | Earlier | Later |
Facing: | West |
Added by: | castlecycles |
Copyright: | Copyright with no re-distribution rights |
Download: | View full-size original |
Credit: | malcolm@castlecycles.co.uk |
Area: | Bolsover |
Northbound view of bridge over Stockley Brook. Note the bridge structure is raised from the trail and is vertical - ok for MTB but not narrower section tyres.
Comments reflect the views of the original submitter only.