Add to Gallery: | Add this photo to a Gallery |
Category: | Cycleway: An example of good practice |
Tags: | bridge, double-yellow, dyl, knightswood, new, orcas, roadspacereallocation |
Date time: | 12.07pm, Tuesday 31st July, 2018 |
Time line: | Earlier | Later |
Facing: | South |
Added by: | andypreece |
Copyright: | CC Attribution-Share Alike (by-sa) |
Download: | View full-size original |
Area: | Glasgow |
The space-wasting hatching on Dyke Road has been removed and a cycleway installed instead.
Comments reflect the views of the original submitter only.